| Topic Areas | Topic Details, Courses, Books | Weighting |
|---|---|---|
| SUM Execution Part | Perform the SUM execution part, including DMO ADM328 | > 12% |
| Downtime | Describe the factors influencing downtime and techniques to reduce downtime ADM328 | 8% - 12% |
| SAP S/4HANA Conversion Prepare Phase | Describe and perform the actions necessary during the SAP S/4HANA conversion prepare phase ADM328 | > 12% |
| SUM Prepare Part | Perform the SUM prepare part ADM328 | > 12% |
SAP S/4HANA Conversion and SAP System Upgrade Certification Exam Details:
| Schedule Exam | SAP Training |
| Number of Questions | 40 |
| Reference Books | ADM328, ADM328 (SAP S/4HANA 2020) |
| Duration | 90 mins |
| Passing Score | E_S4HCON2022 - 65% E_S4HCON2020 - 68% |
| Level | Associate |
NEW QUESTION 36
You are using the maintenance planner to calculate the required software components for your SAP S4HANA conversion. What do you need to know regarding SUM?
- A. As soon as the next SP level of SUM is available, the current version of SUM passes into "patch on request mode" immediately.
- B. AA
Answer: A
NEW QUESTION 37
You are performing an S/4HANA conversion of the development system. Which credentials do you use in which system to perform the adjustment of dictionary objects (SPDD)?
Please choose the correct answer.
Response:
- A. Credentials of a named user in the development client of the development system
- B. Credentials of user DDIC in the development client of the development system
- C. Credentials of user DDIC in client 000 of the shadow system
- D. Credentials of a named user in client 000 of the shadow system
Answer: D
NEW QUESTION 38
You are performing an SAP S/4HANA conversion. Which phases are executed during SUM technical downtime? Note: There are 2 correct answers to this question
- A. PARMVNT_UPG
- B. PARDIST_SHD
- C. TABIM_SHADOW_*
- D. TABIMJJPG
Answer: D
NEW QUESTION 39
You are performing an SAP S/4HANA conversion with DMO as an inplace migration. How does SUM transfer the data by default from the source database to the target database during the migration?
- A. Using R3load and memory pipes
- B. Using R3load and network socket connection
- C. Using R3load and file transfer
- D. Using work processes and network socket connection
Answer: A
NEW QUESTION 40
You are performing an SAP S/4HANA conversion of the development system. Which credentials do you use in which system to perform the adjustment of programs and other non-dictionary repository objects (SPAU)?
Please choose the correct answer.
- A. Credentials of a named user in the development client of the development system
- B. Credentials of user DDIC in the development client of the development system
- C. Credentials of a named user in client 000 of the shadow system
- D. Credentials of user DDIC in client 000 of the shadow system
Answer: A
NEW QUESTION 41
In which scenarios do you need to use SUM 2.0 instead of SUM 1.0?
There are 2 correct answers to this question.
Response:
- A. Upgrading to SAP ECC 6.08 without using DMO
- B. Updating to SAP ECC 6.07 using DMO
- C. Using DMO when applying Support Packages to SAP ECC 6.07
- D. SAP S/4HANA conversion to SAP S/4HANA 1709
Answer: A,D
NEW QUESTION 42
What do you need to consider when performing the SI checks for an SAP S/4HANA conversion? There are 2 correct answers to this question.
- A. Depending on the SAP S/4HANA version, there are different SI check frameworks.
- B. You need to build up a SI check framework by applying SAP notes.
- C. You need an SAP system based on AS ABAP 7.50 or above for the SI check framework.
- D. The SI checks are executed in the development system and the results are transported into the subsequent systems.
Answer: A,B
NEW QUESTION 43
ICNV initialization does 3
- A. Creation of flag
- B. Build index on flag column
- C. Creation of views
- D. AA
Answer: A,B,C
NEW QUESTION 44
During the SUM procedure, the phase XPRAS_AIMMRG fails. Where can you most likely see the reason for the error?
There are 2 correct answers to this question.
Response:
- A. In the corresponding R3trans log files of this phase
- B. In the job log for the corresponding job in SM37 (Job Overview)
- C. In the latest log files in the SUM directory, subdirectory ABAP, subdirectory tmp
- D. In the latest log files in the SUM directory, subdirectory ABAP, subdirectory log
Answer: B,D
NEW QUESTION 45
You want to use the downtime-optimized data conversion for your SAP S/4HANA conversion. What is the main difference from a standard SAP S/4HANA conversion?
Please choose the correct answer.
Response:
- A. TABIMJJPG is executed in uptime
- B. Dedicated application tables are migrated in uptime
- C. An additional temporary database is used during uptime
- D. The repository is migrated in uptime
Answer: B
NEW QUESTION 46
Which maintenance events are possible with SUM for an SAP system based on AS ABAP 7.40 and above? There are 3 correct answers to this question.
- A. Support Package Stack update
- B. Database migration
- C. Release upgrade
- D. Homogenous system copy
- E. Dual Stack split
Answer: A,B,C
NEW QUESTION 47
You are using DMO of SUM. You defined 40 parallel R3load processes during uptime and 80 parallel R3load processes during downtime.
The server provides 8 CPU cores. Phase EU_CLONE_MIG_DT_RUN is running. In the Charts Control Center you can see 40 Process Buckets being executed in parallel.
Why are 40 Process Buckets executed in parallel?
Please choose the correct answer.
Response:
- A. There is a maximum of 40 parallel R31oad processes within this specific downtime phase.
- B. The number of CPU cores does not allow more than 40 R31oad processes to be run in parallel.
- C. SUM is still running in uptime; the number of 40 defined R31oad processes is considered.
- D. These are 40 pairs of R3load processes, so there are 80 R3load processes running.
Answer: D
NEW QUESTION 48
You are performing an upgrade with SUM. You are in the BIND_PATCH phase of the roadmap step "Configuration". For some software components you find entries in the "Calculated level" column.
What does the "Calculated level" indicate for those software components?
Please choose the correct answer.
Response:
- A. The SAP Support packages of the Support Package Stack, calculated by the Maintenance Planner
- B. The SAP Support Packages that will be bound to the upgrade
- C. The SAP Support Packages contained in the upgrade media
- D. The SAP Support Packages found in the download directory
Answer: D
NEW QUESTION 49
SUM was registered at the SAP Host Agent. Based on which information does the SAP Host Agent determine the path to the SUM directory.
- A. The path is taken from the URL entered in the browser to start SUM
- B. The path was stored in file sumabap conf during registration
- C. The path was stored in file host_profile during registration
- D. The path was stored to the environment of user <sid>adm during registration
Answer: B
NEW QUESTION 50
How does SUM recognize modification adjustment transports from predecessor systems?
Please choose the correct answer.
Response:
- A. By searching for transport requests in the file umodauto.Ist
- B. By searching for transport requests in DIR_TRANS, subdirectory "transport"
- C. By searching for transport requests that are assigned to the project SAP_ADJUST
- D. By searching for transport requests named <SID>K0<number>
Answer: A
NEW QUESTION 51
You are planning to use DMO of SUM to perform an "inplace-migration" to SAP HANA.
What do you need to consider? Note: there are 2 correct answers to this question.
- A. SAP HANA Landscape Reorganization required a manual step to edit a file.
- B. The target database size increases temporarily because of the Shadow Repository.
- C. The source system is non-Unicode and the target database is a scale-out system.
- D. Network capacity between exporting and importing R3load processes must be.
- E. Unicode conversion is part of DMO only in case of target version AS ABAP 7.40 or 7.31.
Answer: A,E
NEW QUESTION 52
Which downtime optimization technique requires the minimized downtime service (MDS) from SAP?
- A. Near-Zero Downtime Technology (NZDT)
- B. Near-Zero Downtime Maintenance (nZDM)
- C. Downtime Optimized DMO (DoDMO)
- D. Downtime Optimized Data Conversion (DoC)
Answer: A
NEW QUESTION 53
What SAP systems can you use for the ABAP Test Cockpit (ATC) to perform the custom code analysis for an SAP S/4HANA conversion? Note: There are 2 correct answers to this question.
- A. SAP S/4HANA Server 1809 and above
- B. SAP Solution Manager 7.2
- C. SAP ECC system from SAP ERP 6.0 EHP 8
- D. Standalone AS ABAP with SAP_BASIS 752 and above
Answer: A,D
NEW QUESTION 54
During the configuration of the DMO for SUM, how does the tool behave if option "Do not compare table contents" is selected regarding table comparison?
Please choose the correct answer.
Response:
- A. It performs a comparison of all tables using check sum.
- B. It does NOT perform any table comparison.
- C. It performs a comparison on all tables using row counts.
- D. It performs a comparison on selected tables using check sum.
Answer: C
NEW QUESTION 55
Which steps should be performed during the adjustment of dictionary objects (SPDD) in the development system, before SUM continues?
There are 2 correct answers to this question.
Response:
- A. Manually activate the adjusted dictionary objects
- B. Create "modified* versions of the objects that you need to adjust
- C. Assign the transport request as a modification adjustment transport
- D. Release the transport request containing the modification adjustment
Answer: B,C
NEW QUESTION 56
What can you achieve by setting the SUM parameter "migration_only" to 1 in parameter file SAPup_add.par?
Please choose the correct answer.
Response:
- A. An upgrade of the software components is performed, without changing the database type.
- B. An SAP S/4HANA conversion is performed, without adapting the customer data.
- C. A migration of the SAP system to a new hardware is performed, without performing an SAP S/4HANA conversion.
- D. A change of the database type is performed, without changing the software components.
Answer: D
NEW QUESTION 57
During a SUM run you want to check if the phase SHADOW_IMPORT_INC is still running properly. Where can you find information about this?
There are 2 correct answers to this question.
Response:
- A. Check for running R3trans processes on the host of the primary application server
- B. Check for running batch jobs in the shadow system via Job Overview (SM37)
- C. Check for the latest log files in the SUM directory, subdirectory ABAP, subdirectory tmp
- D. Check for running R31oad processes on the host of the primary application server
Answer: A,C
NEW QUESTION 58
Which circumstances will allow SUM to run without the creation of a shadow system?
Please choose the correct answer.
Response:
- A. Using the main configuration option "Single System" when installing an Add-On
- B. Using the main configuration option "Standard" when applying SAP Support Packages
- C. Using the main configuration option "Single System" in case of an upgrade.
- D. Using the database migration option (DMO) for SUM
Answer: A